Earth Control Measures

Overview

After a heavy downpour, the waterways often turn brown. This is because silt gets washed down from exposed earth surfaces and construction sites. To tackle the problem of silty discharge, PUB has been working with the stakeholders on education and engagement, technology upgrading, and encouraging good earth control measures (ECM) practices.

Silty Waterways
Silty runoff will turn the waterways brown and unsightly.

Clean Waterways
Good ECM practices prevent silty runoff and keep our waterways beautiful. 

To promote awareness, PUB together with Singapore Contractors Association Ltd (SCAL), Institute of Engineers Singapore (IES) and other public agencies, jointly holds seminars and sharing sessions on erosion and sediment control.

PUB also revised its Code of Practice on Surface Water Drainage in 2007 to require contractors to implement best practices on ECM at worksites. Along with the revision, building contractors have been required to submit an ECM plan to PUB, designed and endorsed by a Qualified Erosion Control Professional, and implement the ECM plan before the start of any construction work. Requirements for ECM were further refined in the 2011 revision of the Code of Practice on Surface Water Drainage.

The 5th edition of the Singapore Contractors Association Limited (SCAL)-PUB ECM guidebook, published in May 2018, is available for download [PDF].

Stakeholders
Everyone plays a part in keeping our waters and water catchments clean.

Contractors

 
 

At all times, Contractors shall ensure that all activities at the construction sites do not cause muddy water pollution.

Useful Reminders and Links

  1. Price for earth control measure is adequately reflected in the tender

    Click link for Sample Tender Specifications
  2. Engage a Professional, Qualified Erosion Control Professional (QECP) to design and implement earth control measures (ECM)
  3. Provide all project information to QECP (i.e., work sequence, site terrain, soil profile, existing and proposed services alignment)

    Click link to download Roles of Contractors and QECPs
  4. Obtain ECM approval from PUB and work with QECP to implement ECM before earthwork starts

    Click link for Submission Guidelines, ECM Guidebook and Code of Practice
  5. The builder and QECP shall carry out a joint site audit check within 6 months upon the start of the construction or a third of the project construction period, whichever shorter.  The Builder shall submit the ECM site audit form within 2 weeks of the audit check
  6. During work, adopt best practices for ECM Monitor site and comply with discharge standard at all times.

    Click 
    link for Best Practices.
  7. Click link to download Legislation on:
    1. Relevant provisions relating to works affecting stormwater drainage system under the Sewerage and Drainage Act, Chapter 294
    2. Relevant provisions relating to the prohibition of discharge of silt into the stormwater drainage system under the Sewerage and Drainage (Surface Water Drainage) Regulations (Revised Edition 2007)

Developers

 
 

Developers own the site and at all times, shall ensure that all activities at the site do not cause muddy water pollution.

Useful Reminders and Links

  1. Form in-house ECM committee to address earth control at corporate level and work closely with PUB;

    Click link to Professionals.
  2. Engage a qualified erosion control professional (QECP) to oversee all ECM matters
  3. Develop detailed specifications and costing requirements for project tender;

    Click link for Sample Tender Specifications
  4. Audit ECM at development sites and/or require regular ECM reports from contractors;
  5. Require the installation of on-line instruments and CCTVs to monitor silt discharges from their project sites.

    Click link for Best Practices.

Qualified Erosion Control Professionals (QECPs)

 
 

QECPs are professional engineers engaged by owners/contractors of a development to design and supervise the implementation of ECM at construction sites.

Useful Reminders and Links

  1. Design ECM plan, taking into consideration the sequence of construction works and site conditions (i.e. site terrain, soil profile, existing and proposed services alignment)

    Click link to download Code of Practice on Surface Water Drainage.
  2. Incorporate design details and costing in tender

    Click link for Sample Tender Specifications
  3. Provide detailed ECM plan for contractor to submit to PUB for clearance

    Click for ECM Submission Requirements, ECM Submission Guidelines and ECM Drawing Guidelines
  4. List of categories eligible for ECM self-declaration

    Click for Self-declaration Criteria
  5. Supervise the implementation of ECM at construction site
  6. Audit ECM at site

    Click link to download ECM Site Audit Form and ECM Guidebook 

Contact Us

General enquiry, report on errant sites and muddy water pollution:
Please call PUB 24-hour Call Centre toll free hotline @ 1800-CALL-PUB (1800-2255-782) or email to PUB_CWENF@pub.gov.sg

If you would like to speak directly to our officers-in-charge of ECM matters, please contact:

AW Kwong Yew
Email: AW_Kwong_Yew@pub.gov.sg
Tel: 6731 3464

Alan Tan Chin Hin
Email: TAN_Chin_hin@pub.gov.sg
Tel: 6731 3334

From Mondays to Fridays, during office hours between 9am – 12pm and 1pm – 5pm. 