Handing Over of Completed Drainage Works

QP shall submit the Handing Over form at the CSC stage. This is to facilitate the handing over of the completed drainage works to PUB.  

Download document >> 

ABC Waters Design Features Declaration Form

QP shall submit the Declaration form for ABC Waters Design Features if there is any ABC Waters design feature used for detention purpose as per COP Clause 7.1.5.

Download document >> 

SCAL-PUB Guide Book on Erosion and Sediment Control at Construction Sites (2018 Edition)

The guide book highlights on the basic measures that the contractors should take to prevent or minimise water pollution by reducing the wash down of silt from the construction sites into the public drain. 

Download document >> 